2.4 Supply conditions
2.4.1 Equipment responsibility
Upon receipt of the equipment the system owner or installation
shipyard automatically becomes fully responsible for the
equipment, unless otherwise stated in the contract. This
responsibility covers the storage period before installation, the
actual installation, commissioning, and the period between the
completion of the commissioning and the acceptance of the
equipment by the end user (normally the owner of the vessel or
platform into which the equipment is to be installed).
During the installation period the equipment must be covered in
such a way that it is protected from dust, paint spray/splashes and
welding/cutting sparks. Precautions must be taken to ensure that
no part of the equipment is used as a work platform, or for any
other purpose for which it was not designed.
Any damage incurred during the installation period, even with a
Kongsberg Maritime AS representative present, is the installation
shipyard’s responsibility unless it can be proven that the damage
was due to production or material defects in the equipment
delivered by Kongsberg Maritime AS, or irresponsibility by
Kongsberg Maritime AS personnel.
2.4.2 Project management
Project manager
Kongsberg Maritime AS will normally appoint a dedicated
project manager for the delivery project. The manager will
follow up the installation and delivery, and will be the installation
shipyard’s and end user’s point of contact.
Installation performed by Kongsberg Maritime
Kongsberg Maritime AS will assist during the installation if
specified in the contract or requested by the installation shipyard
or customer. Before any installation work by Kongsberg
Maritime AS can begin, all cables (at least those which are in
any way connected with the system) must be run and connected
to their respective terminations. These cables together with the
transducer installation will then be checked by the Kongsberg
Maritime AS engineers before they are used.
Depending upon the availability of electrical power either from
the generators on board or from ashore, the equipment related to
the system, and the various parts of the system will be tested
during the Setting to Work (STW) period. This requires that
interfaces to equipment delivered by other subcontractors are
ready for integration testing.
14
164851/C
Содержание EM 710
Страница 1: ...Installation Manual EM 710 Multibeam echo sounder ...
Страница 2: ......
Страница 3: ...Kongsberg EM 710 Multibeam echo sounder Installation Manual Kongsberg Maritime 164851 C June 2009 ...
Страница 44: ...Kongsberg EM 710 Figure 10 Transducer mounting principles 42 164851 C ...
Страница 63: ...Cable layout Figure 20 Transceiver Unit front view 0 5 x 1 degree 164851 C 61 ...
Страница 88: ...Kongsberg EM 710 Figure 42 Cable clamp Transceiver Unit cable clamp on page 133 86 164851 C ...
Страница 112: ...Kongsberg EM 710 10 1 Installation Drawings 10 1 1 0 5º mounting frame assembly TX module 110 164851 C ...
Страница 113: ...Installation drawings 164851 C 111 ...
Страница 114: ...Kongsberg EM 710 10 1 2 1 mounting frame assembly RX module 112 164851 C ...
Страница 115: ...Installation drawings 164851 C 113 ...
Страница 116: ...Kongsberg EM 710 10 1 3 2 mounting frame assembly TX RX module 114 164851 C ...
Страница 117: ...Installation drawings 164851 C 115 ...
Страница 118: ...Kongsberg EM 710 10 1 4 0 5 x 1 gondola 116 164851 C ...
Страница 119: ...Installation drawings 164851 C 117 ...
Страница 120: ...Kongsberg EM 710 10 1 5 Transducer TX1 Outline dimensions 118 164851 C ...
Страница 121: ...Installation drawings 164851 C 119 ...
Страница 122: ...Kongsberg EM 710 10 1 6 Transducer TX2 Outline dimensions 120 164851 C ...
Страница 123: ...Installation drawings 164851 C 121 ...
Страница 124: ...Kongsberg EM 710 10 1 7 Transducer RX1 Outline dimensions 122 164851 C ...
Страница 125: ...Installation drawings 164851 C 123 ...
Страница 126: ...Kongsberg EM 710 10 1 8 Transducer RX2 Outline dimensions 124 164851 C ...
Страница 127: ...Installation drawings 164851 C 125 ...
Страница 128: ...Kongsberg EM 710 10 1 9 HWS Operator Station Outline dimensions 126 164851 C ...
Страница 129: ...Installation drawings 10 1 10 Transceiver Unit Outline dimensions 164851 C 127 ...
Страница 130: ...Kongsberg EM 710 128 164851 C ...
Страница 131: ...Installation drawings 10 1 11 Transceiver Unit 2 x 2 degree system Outline dimensions 164851 C 129 ...
Страница 132: ...Kongsberg EM 710 130 164851 C ...
Страница 133: ...Installation drawings 10 1 12 Transceiver Unit mounting bracket 164851 C 131 ...
Страница 134: ...Kongsberg EM 710 10 1 13 Junction Box outline dimensions 132 164851 C ...
Страница 135: ...Installation drawings 10 1 14 Transceiver Unit cable clamp 164851 C 133 ...
Страница 153: ...Installation drawings 164851 C 151 ...
Страница 155: ...EM 710 Multibeam echo sounder Installation manual EM 710 Multibeam echo sounder Maintenance manual ...