Towing method of the machine without outriggers
Fit a suitable pin (2) in the hole shown and hold it in place with
the screws or safety locking pin and hook the chain to the pin.
Towing method of the machine with outriggers
Fit a suitable pin (3) in the hole shown and hold it in place with
the screws or safety locking pin and hook the chain to the pin.
Towing method of the machine with blade
Connect the chain to the blade (4) as shown in the figure.
PRECAUTIONS FOR SEVERE JOB CONDITION
• When performing digging operations in water, if the work equipment mounting pin goes into the water, per-
form greasing every time the operation is performed.
• For heavy-duty operations and deep digging, perform greasing of the work equipment mounting pins every
time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
RKA52630
RKA52640
RKA52650
OPERATION
TROUBLES AND ACTIONS
3-245
WENAM00130
Содержание PW118MR-11
Страница 2: ......
Страница 9: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVEL 1 7 WENAM00130...
Страница 22: ...WENAM00130...
Страница 25: ...LOCATION OF SAFETY LABELS RKA64590 SAFETY SAFETY LABELS 2 3 WENAM00130...
Страница 72: ...WENAM00130...
Страница 74: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA61930 GENERAL VIEW OPERATION 3 2 WENAM00130...
Страница 77: ...CONTROLS AND GAUGES NAMES RKA62690 OPERATION GENERAL VIEW 3 5 WENAM00130...
Страница 168: ...SWITCHES RKA63060 EXPLANATION OF COMPONENTS OPERATION 3 96 WENAM00130...
Страница 328: ...WENAM00130...
Страница 329: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00130...
Страница 412: ...WENAM00130...
Страница 413: ...SPECIFICATIONS 5 1 WENAM00130...
Страница 445: ...REPLACEMENT PARTS 7 1 WENAM00130...
Страница 461: ......
Страница 462: ......