![Komatsu PC20R-8 Скачать руководство пользователя страница 188](http://html1.mh-extra.com/html/komatsu/pc20r-8/pc20r-8_operation-and-maintenance-manual_1991232188.webp)
186
ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
2 - Keep the pressure of the excavator on the hammer constant
as the bit penetrates in the material.
Always follow the hammer in the penetration phase and oper-
ate the excavator arms in order to obtain a pressure sufficient
to keep the undercarriage raised at about 5 mm from the
ground.
Do not raise the undercarriage more than necessary.
3 - When working on very hard materials, it is important not to
keep hitting the same point for more than 30 seconds.
Hit the same point for a few seconds and change position
very frequently, in order to facilitate the breaking of the mate-
rial.
4 - To facilitate the sliding of the tool on its seat, check the thrust
direction and always correct the hitting position of the ham-
mer by means of the bucket and arm control.
5 - Always check that the arm thrust is optimal, in order to avoid
harmful and useless strokes.
RWA06420
RWA06430
RWA06440
RWA06450
Содержание PC20R-8
Страница 2: ......
Страница 12: ...10...
Страница 20: ...18...
Страница 21: ...SAFETY AND ACCIDENT PREVENTION...
Страница 23: ...SAFETY NOISE AND VIBRATION PLATES 21 MACHINE WITH CANOPY RWA00010 RWA00030 RWA00020 RYA11890...
Страница 27: ...SAFETY NOISE AND VIBRATION PLATES 25 LIFTING POINT DO NOT LIFT MORE THAN 1000 kg RWA04920 1000 Kg RWA00210...
Страница 54: ...52...
Страница 55: ...THE MACHINE AND ITS OPERATIONS...
Страница 118: ...116...
Страница 119: ...MAINTENANCE...
Страница 172: ...170...
Страница 173: ...TECHNICAL SPECIFICATIONS...
Страница 182: ...180...
Страница 183: ...AUTHORISED OPTIONAL EQUIPMENT...