MAINTENANCE PLAN
167
11-Extend the boom, arm and bucket cylinders completely as in-
dicated in the figure and remove the filling cap (1).
Put back the cap and pressurize the inside of the tank lower-
ing the equipment to the ground.
12-Make sure that all the control levers are in neutral and let the
engine idle for 2÷3 minutes before operating the work equip-
ment.
Move each piston more than once in order to deaerate the
system; check the level again and top up if necessary.
CAUTION
•
Do not start the engine with empty tank, since this would
certainly damage the pump.
IMPORTANT
☞
•
The hydraulic oil of the machines equipped with demoli-
tion hammer deteriorates more rapidly than the oil of the
machines used for simple digging operations.
Perform the oil changes according to the indications giv-
en in the table beside.
RWA06730
0
20
40
60
80
100
500
2000
Breaker operating
ratio (%)
Replacement interval (H)
Replacement interval
for hydraulic oil
RWA10220
1500
1000
Содержание PC20R-8
Страница 2: ......
Страница 12: ...10...
Страница 20: ...18...
Страница 21: ...SAFETY AND ACCIDENT PREVENTION...
Страница 23: ...SAFETY NOISE AND VIBRATION PLATES 21 MACHINE WITH CANOPY RWA00010 RWA00030 RWA00020 RYA11890...
Страница 27: ...SAFETY NOISE AND VIBRATION PLATES 25 LIFTING POINT DO NOT LIFT MORE THAN 1000 kg RWA04920 1000 Kg RWA00210...
Страница 54: ...52...
Страница 55: ...THE MACHINE AND ITS OPERATIONS...
Страница 118: ...116...
Страница 119: ...MAINTENANCE...
Страница 172: ...170...
Страница 173: ...TECHNICAL SPECIFICATIONS...
Страница 182: ...180...
Страница 183: ...AUTHORISED OPTIONAL EQUIPMENT...