106
USING THE WORK EQUIPMENT
3.13.2 POSITIONING THE MACHINE FOR
DIGGING OPERATIONS
DANGER
•
Before moving the equipment, make sure that no one is
standing in the work area.
•
Carry out all the possible movements and make sure that
the control levers work properly.
•
If visibility is not perfect or there are ducts or lines of any
kind, work at reduced speed and ask the assistance of an-
other operator.
1 - Center the machine with respect to the digging line.
IMPORTANT
☞
•
If this is not possible, because it is necessary to dig along
walls or banks, swing the boom sidewards and position
the machine beside the point where the excavation must
be carried out.
2 - Release the boom swing from the safety lock (1) and release
the upper structure rotation by lifting the antirotation pin (2).
3 - Fasten the safety belt and accelerate until reaching a medi-
um speed.
4 - Shift the safety device lever (3) to the release position and
start work.
RWA09110
1
RWA09120
2
RYA12220
3
Содержание PC20R-8
Страница 2: ......
Страница 12: ...10...
Страница 20: ...18...
Страница 21: ...SAFETY AND ACCIDENT PREVENTION...
Страница 23: ...SAFETY NOISE AND VIBRATION PLATES 21 MACHINE WITH CANOPY RWA00010 RWA00030 RWA00020 RYA11890...
Страница 27: ...SAFETY NOISE AND VIBRATION PLATES 25 LIFTING POINT DO NOT LIFT MORE THAN 1000 kg RWA04920 1000 Kg RWA00210...
Страница 54: ...52...
Страница 55: ...THE MACHINE AND ITS OPERATIONS...
Страница 118: ...116...
Страница 119: ...MAINTENANCE...
Страница 172: ...170...
Страница 173: ...TECHNICAL SPECIFICATIONS...
Страница 182: ...180...
Страница 183: ...AUTHORISED OPTIONAL EQUIPMENT...