ATTACHMENTS AND OPTIONS
HANDLING SERVICE CENTER
6-33
5.
Stow the service arm. For details, see “When Raising Ser-
vice Arm (Setting to Stowing Position) (6-18)“.
6.
Adjust with adjustment nuts (4) and (5) of proximity switch
(1) so that clearance (C) between proximity switch (1) and
plate (3) installed to service arm is 4-6 mm (0.16 - 0.23 in).
Action When Proximity Switch Has Failed
6
WARNING
When the following procedure is used to disconnect the connector of the proximity switch and then con-
nect it to another connector, the PPC (proportional pressure control pilot) lock will always remain
released (the machine can move), regardless of the operation of the service center.
This change in the combination of the connectors is a temporary measure to enable the machine to be
moved to a safe place. After moving the machine, contact your Komatsu distributor immediately and ask
for repairs to be carried out.
The machine can move, so this is extremely dangerous. In addition, do not carry out greasing operations
using the service center with the combination of the connectors changed.
If it is necessary to add fuel by the time that the proximity switch is repaired, add fuel through the fuel filler
port on top of the fuel tank. For details, see “Check Fuel Level, Add Fuel (3-164)“.
NOTICE
When the changing the combination of the connectors, be careful not to mistake the connections.
1.
Turn the starting switch to the OFF position, remove the key, wait for approx. 1 minute, then remove the nega-
tive (-) terminal of the battery.
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...