PRECAUTIONS FOR OPERATION
SAFETY
2-28
q
To make it easier to escape if there is any problem, set the
tracks at right angles to the road shoulder or cliff with the
sprocket at the rear when carrying out operations.
q
When carrying out demolition work, do not carry out demo-
lition work under the front of the machine. This makes the
ground unstable, and there is a hazard of the machine fall-
ing.
q
When carrying out demolition work, do not carry out demo-
lition work above your head. There is a hazard of broken
parts falling or of the building collapsing and causing seri-
ous injury or death.
q
When carrying out demolition work, do not use the impact
force of the work equipment for breaking work. There is a
hazard of damage to the work equipment and also a haz-
ard of serious personal injury or death being caused by fly-
ing pieces of broken materials, or of the machine tipping
over due to reaction from the impact.
q
The not pass the bucket over the heads of other workers or over the operator's seat of dump trucks or other
hauling equipment. There is danger that the load may spill or the bucket may hit the dump truck and cause
serious personal injury or death.
q
When working on or from the top of buildings or other structures, check the strength and the structure before
starting operations. There is a hazard of the building collapsing and causing serious injury or damage.
q
Generally speaking, the machine is more liable to overturn when the work equipment is at the side than when
it is at the front or rear.
q
When using a breaker or other heavy work equipment, there is a hazard of the machine losing its balance and
tipping over. When operating on flat ground as well as on slopes.
q
Do not suddenly lower, swing, or stop the work equipment.
q
Do not suddenly extend or retract the boom cylinder. There is a hazard that impact will cause the machine
to tip over.
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...