DETAILED CONTROLS AND GAUGES
OPERATION
3-138
Circuit Breaker Capacity And Name Of Circuit
Circuit breaker (A)
Circuit breaker (B)
No.
Fuse
capacity
Circuit name
1
20A
Pump controller 2
2
20A
Pump controller 1
3
30A
Work lamp
4
30A
Head lamp (right)
5
30A
Head lamp (left)
6
20A
Right bank engine controller
7
20A
Left bank engine controller
8
20A
Starting switch, Pump controller, Monitor
9
20A
VHMS controller, ORBCOMM controller,
Electric priming pump (if equipped)
10
20A
VHMS controller
No. Capacity
Circuit name
1
60A
Left front lamp, Right front lamp, Working
lamp, Pump controller 1, Pump controller 2,
VHMS controller, Bottom dump solenoid valve,
Rotating lamp, Rear and side lamp, Radio,
Wiper, Window washer
2
60A
Swing holding brake solenoid valve, Machine
push-up, Boom anti-vibration solenoid valve,
PPC oil pressure lock solenoid valve, Starting
motor cut relay, Cigarette lighter, Horn, Flash-
ing lights, Air conditioner unit (top), Air condi-
tioner unit (bottom), 12V power source, Spare,
Additional power source
3
60A
VHMS controller, ORBCOMM controller, Elec-
tric priming pump (if equipped), Starting switch,
Pump controller, Monitor, Left bank engine
controller, Right bank engine controller, Radio
backup, Network pass power source, Engine /
Pump / Cab base room lamp, Room lamp,
Emergency stop circuit, Step light, Hydraulic
ladder
4
105A
Left bank engine preheater
5
105A
Right bank engine preheater
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...