OPERATION
DETAILED CONTROLS AND GAUGES
3-149
q
Accumulator for oil cooler circuit
There are six at the oil cooler end inside the power con-
tainer at the rear left of the machine.
REMARK
These accumulators are installed to protect the oil cooler from
abnormal pressure in the hydraulic circuit, and to improve the
reliability of the hydraulic equipment.
METHOD OF RELEASING PRESSURE IN ACCUMULATOR FOR HYDRAULIC CONTROL
CIRCUIT
3
A: Accumulator for cushioning the front idler
B: Accumulator for hydraulic control circuit
C: Accumulator for oil cooler circuit
1.
Lower the work equipment to the ground.
2.
Stop the engine.
3.
Turn the engine starting switch to the ON position.
4.
Move the lock lever (1) to the free position (F), and oper-
ate the work equipment control lever and the attachment
operation pedal (optional) back and forth and to the left and
right up to the stroke end in order to release pressure from
the respective control circuits.
5.
Start up the engine and stop it in a few seconds. And then
carry out the work 3 and 4 above.
6.
Continue the operation in Step 4 until the hissing noise of
pressure oil can no longer be heard. (Approx. 2 - 3 times)
7.
Push down lock lever (1) to locking position (L) to lock the
control lever and attachment operation pedal. However,
pressure cannot be released completely, so when remov-
ing the accumulator for the control circuit, loosen the screw
slowly and do not stand in the direction of hydraulic oil
spurting out.
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...