
MAINTENANCE PROCEDURE
MAINTENANCE
4-30
CHECK AND TIGHTEN TRACK SHOE BOLTS
4
If the machine is used with track shoe bolts (1) loose, they will
break, so tighten any loose bolts immediately.
Tightening
1.
Tighten first to a tightening torque of 686 ± 69 Nm (70 ± 7 kgm), then check that the nut and shoe are in tight
contact with the link mating surface.
2.
After checking, further tighten to the tightening torque of 150° ± 10°.
Order for Tightening
Tighten the bolts in the order shown in the diagram on the right.
After tightening, check that the nut and shoe are in close con-
tact with the link mating surface.
CHECK AND ADJUST TRACK TENSION
4
WARNING
q
For details of the method of starting the engine and operating the work equipment, see “BEFORE
STARTING ENGINE (3-158)“, “STARTING ENGINE (3-189)“, “AFTER STARTING ENGINE (3-192)“, and
“WORK EQUIPMENT CONTROLS AND OPERATIONS (3-217)“.
q
Before carrying out this operation, always bleed the air from the circuit. For details of the procedure
for bleeding air from the hydraulic circuit, see “BLEEDING AIR FROM IDLER CUSHION CIRCUIT (4-
52)“.
The wear of the pins and bushings on the undercarriage will vary with the working conditions and type of soil, so
inspect the track tension frequently in order to maintain the standard tension.
Stop the machine on firm, horizontal ground when carrying out the inspection and maintenance.
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...