MACHINE OPERATIONS AND CONTROLS
OPERATION
3-162
1) Open cover (6) at the rear of the container on the right
side of the machine, and use it as a place to stand.
Remove bolt (7) to open cover (6).
2) After removing cover (8), loosen radiator cap (9) slowly to
release the pressure, then push cap (9) in and loosen it
further to remove it.
3) Check that the coolant is in the hatched portion in the dia-
gram on the right. If the water level is low, add water
through the water filler port.
4) After adding coolant, install cap (9), close cover (8), then
secure it with bolt (7).
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...