DETAILED CONTROLS AND GAUGES
OPERATION
3-104
N (Neutral) : The upper structure and arm are held in position
and do not move.
Right work equipment control lever (4) is used to operate the
boom and bucket.
Boom operation
(a) RAISE
(b) LOWER
Bucket operation
(c) DUMP
(d) CURL
N (Neutral) : The boom and bucket are held in position and do
not move.
DOOR LOCK
3
Use the door lock to fix the door in position after opening it.
1.
Push the door into catch (1) to lock it in position.
2.
When releasing the door lock, pull back lever (2) and open
catch (1). When fixing the door in position, close the catch
securely.
EMERGENCY EXIT FROM OPERATOR'S CAB
3
If it should be impossible to open the cab door for any reason,
use rear left window (B) as an emergency exit.
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...