
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-199
15. Turn fuel control dial (4) to the full speed (MAX) position,
repeat Steps 6 to 9 for 3 to 5 minutes, then check again
that the hydraulic oil temperature monitor is displaying the
correct temperature.
If it is not displaying the correct temperature, repeat Steps
6 to 9 for 3 to 5 minutes until hydraulic oil temperature
monitor (7) displays the correct temperature.
(A) Display when temperature is correct: Monitor back-
ground (C) is blue
(B) Display when temperature is low: Monitor background
(C) is white
For both normal temperatures and cold temperatures, carry out the following operation.
16. Check that fuel control dial (4) is at a point midway
between low idling (MIN) and full speed (MAX).
If it is not at the midway position, set it to the midway posi-
tion and run the engine at a mid-range speed before oper-
ating.
17. Before starting operations, repeat the following operations
slowly 3 to 5 times to circulate warm oil through the control
circuits.
q
Boom control : RAISE (E)
←→
LOWER (F)
q
Arm control : IN (B)
←→
OUT (A)
q
Bucket control: CURL (D)
←→
DUMP (C)
Before carrying out swing operations, cancel swing lock
switch (2) and check that swing lock monitor (24) has gone
out.
q
Swing control : Left (G)
←→
Right (H)
Содержание PC2000-8 BACKHOE
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Страница 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Страница 319: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section...
Страница 411: ...MAINTENANCE MAINTENANCE PROCEDURE 4 93 2 Add a specified amount of power train oil from oil filler port F...
Страница 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Страница 419: ...MAINTENANCE MAINTENANCE PROCEDURE 4 101 q Boom A Important check points q Arm A Important check points...
Страница 433: ...SPECIFICATIONS 15...
Страница 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Страница 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 502: ...INDEX 8 6...
Страница 503: ...COLOPHON 19...
Страница 504: ...COLOPHON 9 2 PC2000 8 HYDRAULIC EXCAVATOR Form No EEAM029900 2010 KOMATSU All Rights Reserved Printed in Belgium 10 10...