TP-5867 11/02
53
Section 6 Component Testing and Adjustment
6.11 Fuel Systems
Single-fuel systems are factory-adjusted for either
natural gas or LP vapor.
Check the generator set
nameplate to determine which fuel the unit uses.
Multi-fuel systems are factory-adjusted for both natural
gas and LP vapor.
The fuel supplier provides and maintains manual
shut-off
valves
and
the
primary
regulator.
A
factory-installed secondary regulator and 12 VDC
solenoid valve are located in the front inlet air
compartment.
The controller energizes the
fuel
solenoid valve to open at start and deenergizes the
valve to close at shutdown.
The secondary fuel
regulator reduces fuel pressure for delivery to the fuel
metering (fuel mixture adjustment) valve. The fuel flows
from the metering valve to the carburetor in a gaseous
state. The carburetor mixes the fuel with intake air for
consumption by the engine.
Refer to the troubleshooting instructions in Section 3,
Troubleshooting, to identify generator set operation
problems that may be caused by an inadequate fuel
supply or incorrectly adjusted or faulty fuel system
components. Then use the instructions in this section to
check fuel system components.
6.11.1 Gas Piping
Verify that the gas pipe size meets the size
specifications in Figure 6-25. Measure the pipe length
from the gas utility pressure regulator to the end of the
pipe where it connects to the fuel inlet of the generator
set.
Add 2.4 m (8 ft.) for each bend in the pipe.
Compare the total length with the chart in Figure 6-25.
Replace piping longer than the listed maximum length
with the larger pipe size shown in the chart. Bleed the air
from the gas lines after installation.
Figure 6-26 lists the maximum natural gas flow rate for
each model.
Maximum Pipe Length m (ft.)
Pipe Size
8.5RMY
11RMY
3/4 in. NPT
18.3
(60)
9.2
(30)
1 in. NPT
61 (200)
30 (100)
1 1/4 in. NPT
91.5 (300)
68.6 (225)
Figure 6-25
Maximum Natural Gas Pipe Length
Generator
Gas Flow Rate,
Generator
Set Model
Gas Flow Rate,
Btu/hr.
8.5RMY
132,000
11RMY
192,000
Figure 6-26
Maximum Natural Gas Flow Rate
6.11.2 Fuel Solenoid Valve
A solenoid valve upstream of the regulator and the
flexible fuel connector provides automatic fuel on/off
control. The engine starting battery powers the solenoid
valve and the engine starting controls open the valve
when the engine cranks or runs.
Gas Valve Operation Test Procedure
1. Disconnect the positive (+) battery lead from the
gas valve terminal.
2. Apply 12 VDC to the gas valve terminal and listen
for an audible click, indicating that the valve
actuates.
3. Replace the gas valve if it does not actuate in
step 2.
6.11.3 Fuel Regulators
The typical gaseous fuel system uses two regulators.
The primary regulator reduces the line pressure to an
allowable inlet pressure for the secondary regulator.
The fuel supplier provides and maintains the primary
regulator. The secondary regulator is factory-installed
on the generator set and is designed for a maximum inlet
pressure of 2.7 kPa (6 oz./in.
2
) or 280 mm (11 in.) water
column.
Note:
Do not attempt to adjust the fuel mixture or engine
speed by adjusting the regulators.
The fuel lock-off prevents fuel flow when the engine is
not operating. See Figure 6-27. Do not try to adjust the
fuel pressure, fuel mixture, or engine speed using the
fuel lock-off.
Checking the Fuel Pressure
Use a gauge or manometer to check the fuel pressure at
the secondary regulator inlet.
See Figure 6-27.
Measure the fuel pressure with the generator set
running at full load.
The fuel pressure should be
178--280 mm (7--11 in.) water column or 1.7--2.7 kPa
(4--6 oz./in.
2
).
Contact the fuel supplier if the inlet
pressure is not within the specified range.
Содержание 11RMY
Страница 1: ...Industrial Generator Sets Models 8 5RMY 11RMY Controllers Relay TP 5867 11 02d Service...
Страница 16: ...TP 5867 11 02 6 Section 1 Specifications Notes...
Страница 32: ...TP 5867 11 02 22 Section 3 Troubleshooting Notes...
Страница 40: ...TP 5867 11 02 30 Section 4 Controller Troubleshooting Notes...
Страница 44: ...TP 5867 11 02 34 Section 5 Generator Relay Controller Troubleshooting Notes...
Страница 68: ...TP 5867 11 02 58 Section 6 Component Testing and Adjustment Notes...
Страница 72: ...TP 5867 11 02 62 Section 7 Generator Reconnection Notes...
Страница 80: ...TP 5867 11 02 70 Section 8 Disassembly Reassembly Notes...
Страница 82: ...TP 5867 11 02 72 Section 9 Wiring Diagrams Notes...
Страница 83: ...TP 5867 11 02 73 Section 9 Diagrams and Drawings Relay Controller Schematic Diagram 1 Phase ADV 6297 B...
Страница 85: ...TP 5867 11 02 75 Section 9 Diagrams and Drawings Relay Controller Schematic Diagram 1 Phase ADV 6297 E...
Страница 87: ...TP 5867 11 02 77 Section 9 Diagrams and Drawings Relay Controller Schematic Diagram ADV 6524...
Страница 88: ...TP 5867 11 02 78 Section 9 Diagrams and Drawings 6 Relay Controller Point to Point Wiring Diagram GM10619...
Страница 96: ......
Страница 97: ......