Section 2 Scheduled Maintenance
Action
System—Component
Visually Inspect
Check
Change
Clean
Test
Interval
Fuel
Flexible lines and connections
X
R
Weekly
Main tank supply level
X
Weekly
Fuel piping
X
Yearly
Lubrication
Oil level
D
D
Weekly
Crankcase breather
D
D
Quarterly
Change oil
D
Yearly or 50 Hrs
Replace filter(s)*
D
Yearly or 50 Hrs
Cooling
Air cleaner to room/enclosure
X
Weekly
Air ducts, louvers
X
X
Yearly
Exhaust Line
Leakage
X
X
Weekly
Insulation, fire hazards
X
Quarterly
Flexible connector(s)
X
Six Months
Hangers and supports
X
Yearly
DC Electrical System
Battery charger operation, charge rate
X
Monthly
Recharge after engine start
[
X
Monthly
Remove corrosion, clean and dry battery and rack
X
X
Monthly
Clean and tighten battery terminals
X
X
Quarterly
Tighten DC electrical connections
X
Six Months
AC Electrical System
General inspection
X
Weekly
Wire abrasions where subject to motion
X
X
Quarterly
Safety and alarm operation
X
X
Six Months
Tighten control and power wiring connections
X
Yearly
Wire-cable insulation breakdown
X
3 Years or 500 Hrs
Engine And Mounting
General inspection
D
Weekly
Air cleaner service
D
D
Six Months
Ignition components
D
D
Yearly
Valve clearance
D
3 Years or 500 Hrs.
Bolt torque
D
D
3 Years or 500 Hrs.
Generator
Compartment condition
X
X
Weekly
Rotor and stator
X
X
Yearly
Measure and record resistance readings of windings with
insulation tester (Megger, with SCR assembly or rectifier
disconnected)
X
Yearly
Run generator set
X
Monthly
Remote control
X
Monthly
Blow dust out of generator*
X
X
2 Years or 300 Hrs
General Condition Of Equipment
Any condition of vibration, leakage, noise, temperature,
or deterioration
X
X
X
Weekly
Interior of equipment room or outdoor weather housing
X
X
Weekly
D
Follow procedures and frequencies indicated in the engine manufacturer’s maintenance manual.
If not indicated, follow this service schedule. Some items may not apply to all generator sets.
R Replace as necessary.
X Action
* Service more frequently if operated in dusty areas.
[
Consult battery manufacturer’s instructions.
Figure 2-4
Service Schedule
Содержание 11RMY
Страница 1: ...Industrial Generator Sets Models 8 5RMY 11RMY Controllers Relay TP 5867 11 02d Service...
Страница 16: ...TP 5867 11 02 6 Section 1 Specifications Notes...
Страница 32: ...TP 5867 11 02 22 Section 3 Troubleshooting Notes...
Страница 40: ...TP 5867 11 02 30 Section 4 Controller Troubleshooting Notes...
Страница 44: ...TP 5867 11 02 34 Section 5 Generator Relay Controller Troubleshooting Notes...
Страница 68: ...TP 5867 11 02 58 Section 6 Component Testing and Adjustment Notes...
Страница 72: ...TP 5867 11 02 62 Section 7 Generator Reconnection Notes...
Страница 80: ...TP 5867 11 02 70 Section 8 Disassembly Reassembly Notes...
Страница 82: ...TP 5867 11 02 72 Section 9 Wiring Diagrams Notes...
Страница 83: ...TP 5867 11 02 73 Section 9 Diagrams and Drawings Relay Controller Schematic Diagram 1 Phase ADV 6297 B...
Страница 85: ...TP 5867 11 02 75 Section 9 Diagrams and Drawings Relay Controller Schematic Diagram 1 Phase ADV 6297 E...
Страница 87: ...TP 5867 11 02 77 Section 9 Diagrams and Drawings Relay Controller Schematic Diagram ADV 6524...
Страница 88: ...TP 5867 11 02 78 Section 9 Diagrams and Drawings 6 Relay Controller Point to Point Wiring Diagram GM10619...
Страница 96: ......
Страница 97: ......