22
5.1 Selection of qualified personnel
It is advisable to have trained KNECHT personnel perform the installation
work on the honing machine.
We assume no liability for damage caused by improper installation.
CAUTION
5.2 Installation site
When determining the installation site, bear in mind the space requirement for installation,
maintenance and repair work on the honing machine (see Chapter 3.2).
5.3 Supply connections
The honing machine is delivered ready for connection with the appropriate connection cable.
Confirm that the machine is correctly connected to the current supply.
In the event of an incorrect connection, the grinding wheels can turn
opposite to the specified direction of rotation. Incorrect direction of
rotation can result in serious injuries.
The prescribed direction of rotation must be observed (see Chapter 6).
CAUTION
5.4 Settings
The various components and the electrics are adjusted by KNECHT Maschinenbau GmbH before
delivery.
ATTENTION
Unauthorized changes to set values are not
permitted and may damage the honing
machine.
5. Installation