NOVAR 2600 Operating Manual
4.4.5.2.3 ACD Process – Automatic Connection Detection
The type of connection
must be set always manually.
The U1 angle
can be set manually too, but we strongly recommend to use automatic setup –
the ACD
process
(Automatic Connection Detection). This process not onlz detects and sets the U1 angle, but
network nominal votage U
NOM
as well.
For the ACD process usage following condition must be fulfilled : either
three-phase
or
single-phase
compensation
capacitors
are connected to
the first four
control outputs
. If,
for example, two-phase capacitors or any chokes connected to the outputs, the CT test gets
fail results !
If inappropriate compensation elements connected to the first four outputs,you can set such
outputs temporary to
the fixed-off
control state; then the instrument will use tor the ACD
process the next four outputs that are set as
the control
outputs.
Following conditions must be fulfilled for the ACD process launch :
•
connection type
is set to 1Y3 or 1D3
•
U1 angle
is not defined (---)
•
switching mode
is not set to
linear
•
main PFC screen is displayed
The controller launches this process automatically after powerup (if it is not in
the standby
state due to
any of alarms).
The process can be started manually too. You can launch it not only in the control state but in the
manual state as well. For this, in
the Installation
parameter group scroll to
the U1 angle
and set it as
undefined (---).
As soon as the process is initiated, the information message appears in the main PFC screen :
Fig. 4.22 : ACD Start Message
During following 10 seconds, you can either cancel the process launch with the
button or to skip the
message timeout with the
button to start the ACD process immediately. Or you can simply let the
timeout to expire and then the ACD process starts.
First of all, the first four
control
outputs are disconnected, step by step. Then the instrument waits until
discharge time of the outputs just disconnected expires. During this,
Output 1.1
message flashes in
the headline, that means that the instrument waits till output No. 1.1 is ready to use.
After all of the outputs discharged, the instrument starts to switch the four outputs step by step. After
each of the step is switched off, following information appears :
•
U1 angle
found (0-L1, for example)
•
U1 voltage (234 V)
•
in the bottom reactive and active powers of the outputpři typu zapojení 1D3 power found and
corresponding angle between voltage and current phasors
52
Automatic Connection
Detection process will be
started in 10 secs
Содержание NOVAR 2600
Страница 82: ...NOVAR 2600 Operating Manual NOVAR 2600 T18 Typical Installation 82...
Страница 83: ...NOVAR 2600 Operating Manual NOVAR 2600 T7 Typical Installation 83...
Страница 87: ...NOVAR 2600 Operating Manual NOVAR 2600 T External Temperature Sensor Connection 87...
Страница 88: ...NOVAR 2600 Operating Manual NOVAR 2600 4 RS485 Remote Communication Connection 88...
Страница 89: ...NOVAR 2600 Operating Manual 8 Manufactured Models and Marking 89...