RPTR-OBA/734
Installation Manual
REV: B (04/25/2022)
7
Figure 4- Horns Installed
3.2
Install Process Outline
For person(s) with prior experience installing this kit, a reminder of the install steps is provided below:
1.
Layout all components of kit
2.
Assemble fittings to Air Tank, On-board Air Kit, Tire Inflation Kit & Air Horns
3.
Pre-assemble & prepare brackets for installation
4.
Install the nut plates
5.
Install the compressor bracket
6.
Install the forward tank bracket
7.
Install the rear tank bracket
8.
Install & connect the tank & compressor
9.
Install the horn brackets (if applicable)
10.
Install and plumb the air horns
11.
Install and plumb the On-board air relocation kit
12.
Route & connect the air tubing
13.
Route and connect the wiring
14.
Test the system
3.3
Approximate Installation Time
This kit is a multi-faceted product consisting of mechanical, electrical, and pneumatic components.
For a typical home mechanic, auto enthusiast, or technician installing this kit for first time; a professional
installation job with setup and testing of final product, is estimated to take:
•
6-12 Hours
END OF SECTION