pRecaution foR installing
how to use top linK holes
when attaching an implement, con-
nect it according to its draft as follow.
•
A: traction power is not required
(rotary etc.)
•
b: Heavy load traction work
•
c: normal load traction work
1. Adjust an angle of the implements
to the desired position by shorten-
ing or lengthening the top link.
2. Adjusting top length varies as a
type of implements used.
(1) top Link
(1) top Link
(2) pin
(3) Lynch pin
(4) top Link Hook
1. Install the top link to the desired
position, and install the pin and
lynch pin.
2. tighten the lock nut on the top link
securely after adjusting top link
length
adjustment of top linK
A40O603A
TG1O607A
stop the engine and lower the
attachment on the ground prior
to disconnecting the lift rod
from the lower link. check the
attachment for proper support.
•
waRning
when there is no implement at-
tached, fix the lower link to the
check link (LH/RH) so that it
does not contact with the rear
wheel.
secure the top link to the hook.
•
•
note
pX7520 / pX9020 / pX1002
6
-
6
TG110-AU-06.indd 6
2013-01-22 오전 10:30:52
Содержание PX1002
Страница 2: ...TG110 AU 00 indd 2 2012 11 15 오후 5 24 31 ...
Страница 12: ...TG110 AU 00 indd 12 2013 03 15 오후 5 09 58 ...
Страница 34: ...MEMO MEMO TG110 AU 01 indd 22 2013 01 23 오후 8 33 52 ...
Страница 40: ...MEMO MEMO TG110 AU 02 indd 6 2013 03 15 오후 5 01 36 ...
Страница 117: ...MEMO MEMO TG110 AU 04 indd 63 2013 03 06 오후 5 18 55 ...
Страница 145: ...MEMO MEMO TG110 AU 05 indd 28 2013 01 22 오전 10 30 01 ...
Страница 210: ...9 9 Engine Troubleshooting 9 2 Tractor Troubleshooting 9 4 TROUBLESHOOTING TG110 AU 09 indd 1 2013 01 22 오전 10 31 51 ...
Страница 216: ...10 10 INDEX INDEX 10 2 TG110 AU 10 indd 1 2013 03 15 오후 5 14 50 ...