
Removal and installation of 3-point hitch implement(with pto shaft)
1. place implement on the level
ground.
2. drive the tractor backward to move
as close as possible to an imple-
ment. (approx. 5 cm)
then, adjust the height of the low-
er link to be parallel to the pins of
the implement.
3. put all the shift levers in the neu-
tral position.
(1) Implement support
(2) Lower Link
(1) check Link pin
4. Remove the pins on either side of
the check link.
5. Remove the ball assembly by
pushing the guide pin operating
lever.
(1) Lever
(2) ball Assembly
A40O607A
A40O612A
A40O613A
pX7520 / pX9020 / pX1002
6
-
TG110-AU-06.indd 2
2013-01-22 오전 10:30:46
Содержание PX1002
Страница 2: ...TG110 AU 00 indd 2 2012 11 15 오후 5 24 31 ...
Страница 12: ...TG110 AU 00 indd 12 2013 03 15 오후 5 09 58 ...
Страница 34: ...MEMO MEMO TG110 AU 01 indd 22 2013 01 23 오후 8 33 52 ...
Страница 40: ...MEMO MEMO TG110 AU 02 indd 6 2013 03 15 오후 5 01 36 ...
Страница 117: ...MEMO MEMO TG110 AU 04 indd 63 2013 03 06 오후 5 18 55 ...
Страница 145: ...MEMO MEMO TG110 AU 05 indd 28 2013 01 22 오전 10 30 01 ...
Страница 210: ...9 9 Engine Troubleshooting 9 2 Tractor Troubleshooting 9 4 TROUBLESHOOTING TG110 AU 09 indd 1 2013 01 22 오전 10 31 51 ...
Страница 216: ...10 10 INDEX INDEX 10 2 TG110 AU 10 indd 1 2013 03 15 오후 5 14 50 ...