Removal and installation of 3-point
hitch implement(with pto shaft) ................. 6-2
opeRation foR 3-point hitch implements ..... 6-5
Adjustment of LIft Rod .....................................................6-5
Adjustment of top LInk .....................................................6-6
pRecAutIon foR InstALLIng How to use top
LInk HoLes.............................................................................6-6
Adjustment of stAbILIzeR .................................................6-7
dIsmountIng tHe ImpLement .............................................6-7
dRAft HItcH And tRAILeR ....................................................6-8
InstALLIng pto sHAft ...........................................................6-9
handling loadeR ................................................. 6-10
dRIvIng on sLope ................................................................6-11
joystIck LeveR ....................................................................6-12
joystIck vALve .....................................................................6-14
6
6
3-point hitch implement and loadeR opeRation
TG110-AU-06.indd 1
2013-01-22 오전 10:30:45
Содержание PX1002
Страница 2: ...TG110 AU 00 indd 2 2012 11 15 오후 5 24 31 ...
Страница 12: ...TG110 AU 00 indd 12 2013 03 15 오후 5 09 58 ...
Страница 34: ...MEMO MEMO TG110 AU 01 indd 22 2013 01 23 오후 8 33 52 ...
Страница 40: ...MEMO MEMO TG110 AU 02 indd 6 2013 03 15 오후 5 01 36 ...
Страница 117: ...MEMO MEMO TG110 AU 04 indd 63 2013 03 06 오후 5 18 55 ...
Страница 145: ...MEMO MEMO TG110 AU 05 indd 28 2013 01 22 오전 10 30 01 ...
Страница 210: ...9 9 Engine Troubleshooting 9 2 Tractor Troubleshooting 9 4 TROUBLESHOOTING TG110 AU 09 indd 1 2013 01 22 오전 10 31 51 ...
Страница 216: ...10 10 INDEX INDEX 10 2 TG110 AU 10 indd 1 2013 03 15 오후 5 14 50 ...