22
\
\
\
1 x
Left Access 1-3/8 x 2-1/2 x 57-53/64”
1 x
Right Access 1-3/8 x 2-1/2 x 57-53/64”
4 x
Tread 15/16 x 3-1/4 x 19-1/2”
023
022
021
Fig. 2.1
Wood Parts
Hardware
Step 2: Access Ladder/Rope Wall Assembly
Part 1
A:
Place (021) Left Access on one side of 4 (023) Treads and (022) Right Access on the other side with the
grooves facing in. (fig. 2.1)
B:
Fit each (023) Tread into grooves on both (021) and (022) Access rails, making sure the top edge of the (023)
Treads are flush to the front of the Access rails. (fig. 2.1 and 2.2)
C:
Pre-drill pilot holes with a 1/8” drill bit and attach rails and treads together using 4 (S3) #8 x 2-1/2” Wood
Screws per tread. (fig. 2.1)
16 x
#8 x 2-1/2” Wood Screw
S3
Fig. 2.2
End View
Flush to
edges
Top Edge of Access Rail
S3
S3
023
022
021
Flush to
top edge
023
Содержание Cedar Summit F25745
Страница 134: ...134 NOTES 134 europecustomerservice kidkraft com...