104
Fig. 57.6
Step 57: Assemble Rock Wall
Part 4
Hardware
2 x
1/4 x 1-3/8” Wafer Lag
(1/4” flat washer)
Other Parts
1 x Steel Hand Grip
WL3
I:
On (058) Rock Wall C, measure 6” up from the floorboards and center 1 Steel Hand Grip. Mark the hole
locations and pre-drill with a 1/8” drill bit making sure holes are centered. Attach Steel Hand Grip using 2 (WL3)
1/4 x 1-3/8” Wafer Lags (with flat washer).
6”
058
Steel
Hand Grip
1/4” Flat
Washer
WL3
Содержание Cedar Summit F25745
Страница 134: ...134 NOTES 134 europecustomerservice kidkraft com...