101
Fig. 57.1
It is important to note hole orientation for the following steps.
A:
In the upper left hand opening of the Rock Wall, center 1 (571) Rock Wall B making sure that it’s flush to the
bottom. Install board with 6 (S20) #8 x 1-3/8” Wood Screws.
B:
Place (572) Rope Support across the top of the upper opening with the rope hole to the right. Rope Support
should be flush with the upper nest floorboards. Attach using 4 (S20) #8 x 1-3/8” Wood Screws.
C:
Taking care to note the hole orientations, place (573,574,575,576)Rock Wall D, E, F and G from left to right so
they are evenly spaced in the bottom opening.
It is important to ensure that the rope hole in (575) Rock Wall F
is at the bottom
. Attach each board using 6 (S20) #8 x 1-3/8” Wood Screws.
Step 57: Assemble Rock Wall
Part 1
Hardware
34 x
#8 x 1-3/8” Wood Screw
S20
Wood Parts
571
572
573
574
575
576
x 6 per
board
x 6 per
board
x 4 per
board
S20
S20
S20
1 x
Rock Wall B 5/8 x 5-1/4 x 56-1/16”
1 x
Rock Wall D 5/8 x 4-1/4 x 57”
1 x
Rock Wall E 5/8 x 4-1/4 x 57”
1 x
Rock Wall F 5/8 x 4-1/4 x 57”
1 x
Rock Wall G 5/8 x 4-1/4 x 57”
1 x
Rope Support 5/8 x 3 x 17-3/16”
571
573
574
575
576
572
rope hole
Flush
rope hole
Содержание Cedar Summit F25745
Страница 134: ...134 NOTES 134 europecustomerservice kidkraft com...