7-66 Keysight N5227B Service Guide
Repair and Replacement Procedures
Removing and Replacing the Rear Panel
7-
Removing and Replacing the Rear Panel
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— 5/16 inch nutsetter (torque to 10 in-lb or 1.13 N.m)
— 5/16 inch nutsetter (torque to 21 in-lb or 2.38 N.m)
— 5/8 inch nutsetter (torque to 21 in-lb or 2.38 N.m)
— 9/32 inch nutsetter (torque to 9 in-lb or 1.02 N.m)
— 3/16 inch nutsetter (torque to 6 in-lb or 0.68 N.m)
— 9/16 inch nutsetter (torque to 21 in-lb or 2.38 N.m)
— 9 mm nutsetter (torque to 21 in-lb or 2.38 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer and inner covers. Refer to
.
3.
Remove the A20 power supply assembly. Refer to
Replacing the A20 Power Supply Assembly” on page 7-24
4.
Remove the A21 CPU board assembly. Refer to
the A21 CPU Board Assembly” on page 7-26
5.
Remove the 50 ohm load(s) (item
➁
).
6.
If installed, remove the cap (item
③
).
7.
Remove the connector hardware (item
④
) from each of the five multi-pin
connectors. The hardware is not the same on each connector so note
which hardware goes with which connector.
8.
Remove the connector hardware (item
⑤
) from each of the RF connectors.
The hardware is not the same on each connector so note which hardware
goes with which connector.
9.
Remove the 13 screws (item
⑥
) that attach the rear panel to the chassis.
10.
Slide the rear panel over the cable connectors and off of the analyzer.
Replacement Procedure
1.
Reverse the order of the removal procedure.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Содержание N5227B
Страница 26: ...2 8 Keysight N5227B Service Guide General Product Information Keysight Support Services and Assistance 2...
Страница 176: ...5 40 Keysight N5227B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 177: ...Keysight N5227B Service Guide 5 41 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 184: ...5 48 Keysight N5227B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 189: ...Keysight N5227B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 203: ...Keysight N5227B Service Guide 6 19 Replaceable Parts Replaceable Parts Listings Figure 6 6 Top Assemblies All Options...
Страница 217: ...Keysight N5227B Service Guide 6 33 Replaceable Parts Replaceable Parts Listings Figure 6 12 Bottom RF Cables Option 201...
Страница 221: ...Keysight N5227B Service Guide 6 37 Replaceable Parts Replaceable Parts Listings Figure 6 14 Bottom Assemblies Option 205...
Страница 237: ...Keysight N5227B Service Guide 6 53 Replaceable Parts Replaceable Parts Listings Figure 6 21 Bottom RF Cables Option 219...
Страница 241: ...Keysight N5227B Service Guide 6 57 Replaceable Parts Replaceable Parts Listings Figure 6 23 Bottom Assemblies Option 220...
Страница 255: ...Keysight N5227B Service Guide 6 71 Replaceable Parts Replaceable Parts Listings Figure 6 29 Bottom Assemblies Option 401...
Страница 263: ...Keysight N5227B Service Guide 6 79 Replaceable Parts Replaceable Parts Listings Figure 6 32 Bottom Assemblies Option 405...
Страница 267: ...Keysight N5227B Service Guide 6 83 Replaceable Parts Replaceable Parts Listings Figure 6 33 Bottom RF Cables Option 405...
Страница 271: ...Keysight N5227B Service Guide 6 87 Replaceable Parts Replaceable Parts Listings Figure 6 35 Bottom Assemblies Option 410...
Страница 279: ...Keysight N5227B Service Guide 6 95 Replaceable Parts Replaceable Parts Listings Figure 6 38 Bottom Assemblies Option 419...
Страница 318: ...6 134 Keysight N5227B Service Guide Replaceable Parts Replaceable Parts Listings 6...