Keysight N5227B Service Guide 1-5
Safety and Regulatory Information
General Safety Considerations
Servicing
These servicing instructions are for use by qualified personnel only.
To avoid electrical shock, do not perform any servicing unless you
are qualified to do so.
Danger of explosion if battery is incorrectly replaced. Replace only
with the same or equivalent type recommended. Discard used
batteries according to local ordinances and/or manufacturer’s
instructions.
Procedures described in this document may be performed with
power supplied to the product while protective covers are removed.
Energy available at many points may, if contacted, result in personal
injury.
No operator serviceable parts inside. Refer servicing to qualified
personnel. To prevent electrical shock, do not remove covers.
Do not operate the analyzer with the outer cover removed for more than
30 minutes, as this could cause the analyzer to overheat which could
result in costly damage.
The opening of covers or removal of parts may expose dangerous
voltages. Disconnect the instrument from all voltage sources while
it is being opened.
The detachable power cord is the instrument disconnecting device.
It disconnects the mains circuits from the mains supply before other
parts of the instrument. The front panel switch is only a standby
switch and is not a LINE switch (disconnecting device).
There are no replaceable fuses in the mains input or within the power
supply assembly.
Keysight personnel: after calibration is completed, attach four “calibration
void if seal broken” stickers to the PNA as shown in
Содержание N5227B
Страница 26: ...2 8 Keysight N5227B Service Guide General Product Information Keysight Support Services and Assistance 2...
Страница 176: ...5 40 Keysight N5227B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 177: ...Keysight N5227B Service Guide 5 41 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 184: ...5 48 Keysight N5227B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 189: ...Keysight N5227B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 203: ...Keysight N5227B Service Guide 6 19 Replaceable Parts Replaceable Parts Listings Figure 6 6 Top Assemblies All Options...
Страница 217: ...Keysight N5227B Service Guide 6 33 Replaceable Parts Replaceable Parts Listings Figure 6 12 Bottom RF Cables Option 201...
Страница 221: ...Keysight N5227B Service Guide 6 37 Replaceable Parts Replaceable Parts Listings Figure 6 14 Bottom Assemblies Option 205...
Страница 237: ...Keysight N5227B Service Guide 6 53 Replaceable Parts Replaceable Parts Listings Figure 6 21 Bottom RF Cables Option 219...
Страница 241: ...Keysight N5227B Service Guide 6 57 Replaceable Parts Replaceable Parts Listings Figure 6 23 Bottom Assemblies Option 220...
Страница 255: ...Keysight N5227B Service Guide 6 71 Replaceable Parts Replaceable Parts Listings Figure 6 29 Bottom Assemblies Option 401...
Страница 263: ...Keysight N5227B Service Guide 6 79 Replaceable Parts Replaceable Parts Listings Figure 6 32 Bottom Assemblies Option 405...
Страница 267: ...Keysight N5227B Service Guide 6 83 Replaceable Parts Replaceable Parts Listings Figure 6 33 Bottom RF Cables Option 405...
Страница 271: ...Keysight N5227B Service Guide 6 87 Replaceable Parts Replaceable Parts Listings Figure 6 35 Bottom Assemblies Option 410...
Страница 279: ...Keysight N5227B Service Guide 6 95 Replaceable Parts Replaceable Parts Listings Figure 6 38 Bottom Assemblies Option 419...
Страница 318: ...6 134 Keysight N5227B Service Guide Replaceable Parts Replaceable Parts Listings 6...