Keysight N5227B Service Guide 7-47
Repair and Replacement Procedures
Removing and Replacing the A38–A41 Source Attenuators and the A46–A49 Receiver
Attenuators
Removing and Replacing the A38–A41 Source Attenuators and the
A46–A49 Receiver Attenuators
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— 5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer cover. Refer to
“Removing the Covers” on page 7-6
3.
Position the analyzer bottom side up.
4.
Disconnect the ribbon cable (item
①
) from each attenuator to be removed.
5.
The attenuators and the brackets to which they are attached, must be
removed as a complete assembly.
Disconnect two semirigid cables (item
➁
) from each attenuator to be
removed. It may be necessary to remove additional cables to remove the
attenuator bracket. If so, note the location and orientation of each for
reinstallation later.
6.
Remove four screws (item
③
) that secure each attenuator bracket to the
test set deck.
7.
Move the disconnected semirigid cables out of the way and lift the
attenuator bracket out of the analyzer, with the attenuator attached. It
may be necessary to loosen the connector at the other end of some of the
semirigid cables to allow them to be moved enough.
8.
Remove two screws from each attenuator to be removed from the
mounting bracket.
Replacement Procedure
1.
Reverse the order of the removal procedure.
Orient the position of the attenuators and brackets as shown in
Torque all cable connections to 10 in-lbs.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary, but do not over-bend the semirigid
cables.
Содержание N5227B
Страница 26: ...2 8 Keysight N5227B Service Guide General Product Information Keysight Support Services and Assistance 2...
Страница 176: ...5 40 Keysight N5227B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 177: ...Keysight N5227B Service Guide 5 41 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 184: ...5 48 Keysight N5227B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 189: ...Keysight N5227B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 203: ...Keysight N5227B Service Guide 6 19 Replaceable Parts Replaceable Parts Listings Figure 6 6 Top Assemblies All Options...
Страница 217: ...Keysight N5227B Service Guide 6 33 Replaceable Parts Replaceable Parts Listings Figure 6 12 Bottom RF Cables Option 201...
Страница 221: ...Keysight N5227B Service Guide 6 37 Replaceable Parts Replaceable Parts Listings Figure 6 14 Bottom Assemblies Option 205...
Страница 237: ...Keysight N5227B Service Guide 6 53 Replaceable Parts Replaceable Parts Listings Figure 6 21 Bottom RF Cables Option 219...
Страница 241: ...Keysight N5227B Service Guide 6 57 Replaceable Parts Replaceable Parts Listings Figure 6 23 Bottom Assemblies Option 220...
Страница 255: ...Keysight N5227B Service Guide 6 71 Replaceable Parts Replaceable Parts Listings Figure 6 29 Bottom Assemblies Option 401...
Страница 263: ...Keysight N5227B Service Guide 6 79 Replaceable Parts Replaceable Parts Listings Figure 6 32 Bottom Assemblies Option 405...
Страница 267: ...Keysight N5227B Service Guide 6 83 Replaceable Parts Replaceable Parts Listings Figure 6 33 Bottom RF Cables Option 405...
Страница 271: ...Keysight N5227B Service Guide 6 87 Replaceable Parts Replaceable Parts Listings Figure 6 35 Bottom Assemblies Option 410...
Страница 279: ...Keysight N5227B Service Guide 6 95 Replaceable Parts Replaceable Parts Listings Figure 6 38 Bottom Assemblies Option 419...
Страница 318: ...6 134 Keysight N5227B Service Guide Replaceable Parts Replaceable Parts Listings 6...