Keysight N5227B Service Guide 4-35
Troubleshooting
Measurement System Troubleshooting
Checking the Source Group
Source Group Tests
Before checking the source group assemblies, you must open the analyzer.
1.
Turn off the analyzer power.
2.
Unplug the power to the analyzer and disconnect all front and rear panel
connections except installed jumpers.
3.
Remove the outer and inner covers from the analyzer. Refer to
.
4.
With the covers off, plug in the analyzer and turn on the power.
Frequency Banded vs. Broadband Failure
There are two main types of failures that are related to the source group.
Frequency banded failures are indicated by all receiver traces having partial
dropouts across the frequency range. Broadband failures are indicated by all
receiver traces being in the noise floor.
RF Signal Troubleshooting
Check the output power of the A, B, C, and D signals:
Equipment Used for This Check
Use an antistatic work surface and wrist strap to reduce the chance of
electrostatic discharge for all of the procedures in this chapter.
Procedures described in this document are performed with power
supplied to the product while protective covers are removed. Energy
available at many points may, if contacted, result in personal injury.
Do not operate the analyzer with the outer cover removed for more than
30 minutes, as this could cause the analyzer to overheat which could
result in costly damage.
Equipment Type
Model or
Part Number
Alternate Model or
Part Number
Power meter
E4418B/E4419B
E4418A/E4419A
Power sensor, 2.4 mm
E8487A
None
Adapter, 2.4 mm (f) to 2.4 mm (f)
11900B
85056-60007
Содержание N5227B
Страница 26: ...2 8 Keysight N5227B Service Guide General Product Information Keysight Support Services and Assistance 2...
Страница 176: ...5 40 Keysight N5227B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 177: ...Keysight N5227B Service Guide 5 41 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 184: ...5 48 Keysight N5227B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 189: ...Keysight N5227B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 203: ...Keysight N5227B Service Guide 6 19 Replaceable Parts Replaceable Parts Listings Figure 6 6 Top Assemblies All Options...
Страница 217: ...Keysight N5227B Service Guide 6 33 Replaceable Parts Replaceable Parts Listings Figure 6 12 Bottom RF Cables Option 201...
Страница 221: ...Keysight N5227B Service Guide 6 37 Replaceable Parts Replaceable Parts Listings Figure 6 14 Bottom Assemblies Option 205...
Страница 237: ...Keysight N5227B Service Guide 6 53 Replaceable Parts Replaceable Parts Listings Figure 6 21 Bottom RF Cables Option 219...
Страница 241: ...Keysight N5227B Service Guide 6 57 Replaceable Parts Replaceable Parts Listings Figure 6 23 Bottom Assemblies Option 220...
Страница 255: ...Keysight N5227B Service Guide 6 71 Replaceable Parts Replaceable Parts Listings Figure 6 29 Bottom Assemblies Option 401...
Страница 263: ...Keysight N5227B Service Guide 6 79 Replaceable Parts Replaceable Parts Listings Figure 6 32 Bottom Assemblies Option 405...
Страница 267: ...Keysight N5227B Service Guide 6 83 Replaceable Parts Replaceable Parts Listings Figure 6 33 Bottom RF Cables Option 405...
Страница 271: ...Keysight N5227B Service Guide 6 87 Replaceable Parts Replaceable Parts Listings Figure 6 35 Bottom Assemblies Option 410...
Страница 279: ...Keysight N5227B Service Guide 6 95 Replaceable Parts Replaceable Parts Listings Figure 6 38 Bottom Assemblies Option 419...
Страница 318: ...6 134 Keysight N5227B Service Guide Replaceable Parts Replaceable Parts Listings 6...