Keysight N5227B Service Guide 7-33
Repair and Replacement Procedures
Removing and Replacing the A24 IF Multiplexer Board
Removing and Replacing the A24 IF Multiplexer Board
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— 5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer cover. Refer to
“Removing the Covers” on page 7-6
3.
Position the analyzer bottom side up.
4.
Remove the A23 test set motherboard. Refer to
the A23 Test Set Motherboard” on page 7-30
5.
Disconnect the ribbon cable (item
①
) from the A24 IF multiplexer board.
6.
Disconnect ALL gray flexible RF cables (item
➁
) from the A24 IF
multiplexer board.
7.
Remove connector hardware (item
③
) from five rear panel RF connectors.
8.
Remove connector hardware (item
④
) from the rear panel PULSE I/O
connector.
9.
Remove four screws (item
⑤
) from the stabilizer bracket and remove the
stabilizer bracket.
10.
Remove four screws (item
⑥
) from the A24 IF multiplexer board.
11.
Slide the A24 IF multiplexer board toward the front of the instrument until
the rear panel connectors are free of the rear panel, then lift the
motherboard and remove it from the analyzer.
Replacement Procedure
1.
Reverse the order of the removal procedure.
Attach the stabilizer bracket to the new A24 IF multiplexer board using the
screws removed from the old one.
Torque rear panel RF connector nuts to 21 in-lbs and PULSE I/O connector
screws to 6 in-lbs.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Содержание N5227B
Страница 26: ...2 8 Keysight N5227B Service Guide General Product Information Keysight Support Services and Assistance 2...
Страница 176: ...5 40 Keysight N5227B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 177: ...Keysight N5227B Service Guide 5 41 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 184: ...5 48 Keysight N5227B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 189: ...Keysight N5227B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 203: ...Keysight N5227B Service Guide 6 19 Replaceable Parts Replaceable Parts Listings Figure 6 6 Top Assemblies All Options...
Страница 217: ...Keysight N5227B Service Guide 6 33 Replaceable Parts Replaceable Parts Listings Figure 6 12 Bottom RF Cables Option 201...
Страница 221: ...Keysight N5227B Service Guide 6 37 Replaceable Parts Replaceable Parts Listings Figure 6 14 Bottom Assemblies Option 205...
Страница 237: ...Keysight N5227B Service Guide 6 53 Replaceable Parts Replaceable Parts Listings Figure 6 21 Bottom RF Cables Option 219...
Страница 241: ...Keysight N5227B Service Guide 6 57 Replaceable Parts Replaceable Parts Listings Figure 6 23 Bottom Assemblies Option 220...
Страница 255: ...Keysight N5227B Service Guide 6 71 Replaceable Parts Replaceable Parts Listings Figure 6 29 Bottom Assemblies Option 401...
Страница 263: ...Keysight N5227B Service Guide 6 79 Replaceable Parts Replaceable Parts Listings Figure 6 32 Bottom Assemblies Option 405...
Страница 267: ...Keysight N5227B Service Guide 6 83 Replaceable Parts Replaceable Parts Listings Figure 6 33 Bottom RF Cables Option 405...
Страница 271: ...Keysight N5227B Service Guide 6 87 Replaceable Parts Replaceable Parts Listings Figure 6 35 Bottom Assemblies Option 410...
Страница 279: ...Keysight N5227B Service Guide 6 95 Replaceable Parts Replaceable Parts Listings Figure 6 38 Bottom Assemblies Option 419...
Страница 318: ...6 134 Keysight N5227B Service Guide Replaceable Parts Replaceable Parts Listings 6...