U3050BH11
Operational Check
S13 Test
Th
is test will verify the RF path highlighted in
. The Port 3 source power travels
through an amplifier, through the coupled path, is reflected off a Short/Open termination, and
is then coupled to RCVR A IN.
1.
Connect a Short/Open to U3050BH11 bulkhead Port
1.
2.
Set source power to -15 dBm
.
3.
Turn on trace S13
.
4.
Verify that the S13 trace has approximately 10 dB of gain at the low end and 10 dB of
loss at the high end as seen in
. (Note: The power at the receiver includes
the insertion loss of cabling and 10 dB of coupling factor loss)
.
Figure
1
2
16
Keysight U3050BH11 User's and Service Guide
Содержание U3050BH11
Страница 4: ...Contents 2...
Страница 5: ...U3050BH11 Keysight U3050BH11 User s and Service Guide 1...
Страница 21: ...U3050BH11 Operational Check Figure 13 Keysight U3050BH11 User s and Service Guide 17...
Страница 23: ...U3050BH11 Operational Check Figure 15 Keysight U3050BH11 User s and Service Guide 19...
Страница 25: ...U3050BH11 Operational Check Figure 17 Keysight U3050BH11 User s and Service Guide 21...
Страница 27: ...U3050BH11 Operational Check Figure 19 Keysight U3050BH11 User s and Service Guide 23...
Страница 29: ...U3050BH11 Operational Check Figure 21 Keysight U3050BH11 User s and Service Guide 25...
Страница 31: ...U3050BH11 Operational Check Figure 23 Keysight U3050BH11 User s and Service Guide 27...
Страница 33: ...U3050BH11 Operational Check Figure 25 Keysight U3050BH11 User s and Service Guide 29...
Страница 37: ...U3050BH11 Theory of Operation Figure 27 U3050BH11 Block Diagram Keysight U3050BH11 User s and Service Guide 33...