Installation Note N5242-90003 21
Description of the Upgrade
Installation Procedure for the Upgrade
Figure 9
Second Source Boards Installation, Part 2
Step 9. Install the Source 2 Front Panel Connectors
Refer to
for this step of the procedure. New parts are listed in
1.
Insert two bulkhead connectors (item
①
) through the holes in the test set
deck front panel as shown.
2.
Secure the bulkhead connectors with two lock washers (item
➁
) and two
hex nuts (item
③
) as shown.
3.
Torque the hex nuts to 21 in-lbs.