10 Installation Note N5242-90003
Description of the Upgrade
Installation Procedure for the Upgrade
-
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.
Overview of the Installation Procedure
“Step 1. Obtain a Keyword and Verify the Information.”
“Step 2. Remove the Outer Cover.”
“Step 3. Remove the Inner Cover.”
“Step 4. Remove the Front Panel Assembly.”
“Step 5. Remove the Existing Test Set Cables.”
“Step 6. Assemble the Mechanical Switches.”
“Step 7. Install the Mechanical Switches.”
“Step 8. Install the Second Source Boards.”
“Step 9. Install the Source 2 Front Panel Connectors.”
“Step 10. Remove the A19 Test Set Motherboard and the A20 IF Multiplexer
Board.”
“Step 11. Install the Bulkhead Connectors and Jumpers on the Rear Panel.”
“Step 12. Install the Bulkhead Connectors in the Test Set Front Plate.”
“Step 13. Install the New Test Set Cables.”
“Step 14. Reinstall the A20 IF Multiplexer Board and the A19 Test Set
Motherboard.”
“Step 15. Replace the Lower Front Panel Overlay.”
“Step 16. Reinstall the Front Panel Assembly and Front Panel Jumpers.”
“Step 17. Position the Cables and Wires to Prevent Pinching.”
“Step 18. Reinstall the Inner Cover.”
“Step 19. Reinstall the Outer Cover.”
“Step 20. Enable Option 224.”
“Step 22. Perform Post-Upgrade Adjustments and Calibration.”
“Step 23. Prepare the PNA for the User.”
This installation requires the removal of the analyzer’s protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.