Performance Verification
5
N2797A User’s Guide
43
Figure 18
SMA Cable Connected to Port 2
14
Get the opposite sex of the Calibration Standards for the next step.
15
Perform Calibration for the
PORT 2
side of the Reference plane.
a
Press the
reflection
screen key.
b
Connect the open end of Calibration Standard to the available end of the
PORT 2
SMA
cable.
c
Select the
open
screen key under the
Reverse
group.
d
Wait until the VNA beeps indicating that it has completed the task.
e
Connect short end of Calibration Standard to the available end of the
PORT 2
SMA cable.
f
Select
short
screen key the
Reverse
group.
g
Wait until the VNA beeps indicating that it has completed the task.
h
Connect load end of Calibration Standard to the available end of the
PORT 2
SMA cable.
i
Select the
loads
screen key the
Reverse
group.
j
Press
broadband
screen key selection.
k
Wait until the VNA beeps indicating that it has completed the task.
l
Press the
done loads
screen key.
m
You have just calibrated the other side of the reference plane.
16
Press
standards done
key.
17
Connect the
PORT 2
SMA cable to the non-pincher side of PV fixture as shown in
.
Содержание N2797A
Страница 1: ...Keysight N2797A Extreme Temperature Single Ended Active Probe User s Guide ...
Страница 4: ...4 N2797A User s Guide Contents ...
Страница 9: ...Using the Probe 1 N2797A User s Guide 9 Figure 2 Accessories Supplied With the Probe Not to Scale ...
Страница 26: ...26 N2797A User s Guide 1 Using the Probe ...
Страница 34: ...34 N2797A User s Guide 3 Characteristics and Specifications ...
Страница 48: ...48 N2797A User s Guide Index ...