6 Keysight E8363B/C and E8364B/C Installation Note
General Information
Installation Procedure for the Upgrade Kit
1-
Step 3. Raise the Receiver Deck.
Step 4. Remove the Existing Cables.
Step 5. Install the Attenuators and Bias Tees.
Step 6. Install the Option UNL Cables.
Step 7. Lower and Fasten the Receiver Deck and Connect the Bias Tee Control Cables.
Step 8. Replace the Lower Front Panel Overlay (Option 014 Only).
Step 9. Reinstall the Front Panel Assembly and Front Panel Jumpers (Option 014 Only).
Step 10. Reinstall the Outer Cover.
Step 12. Perform Post-Upgrade Adjustments and Calibration.
Tools and Equipment Required for the Installation
Equipment Required for Post-Upgrade Adjustments
Description
Qty
Part Number
T-8 TORX driver (set to 5 in-lbs)
1
N/A
T-10 TORX driver (set to 9 in-lbs)
1
N/A
T-20 TORX driver (set to 21 in-lbs)
1
N/A
5/16-inch torque wrench (set to 10 in-lbs)
1
N/A
5/16-inch torque wrench (set to 21 in-lbs) (Option 014 only)
1
N/A
ESD grounding wrist strap
1
9300-1367
5-ft grounding cord for wrist strap
1
9300-0980
2 x 4 ft conductive table mat and 15-ft grounding wire
1
9300-0797
ESD heel strap (for use with conductive floors)
1
9300-1308
Use a 5/16-inch torque wrench set to 10 in-lbs on all cable connections
except the front-panel connectors to which the front-panel jumpers attach
(Option 014). Use a 5/16-inch torque wrench set to 21 in-lbs for these
connections.
Equipment Type
Model or
Part Number
Alternate Model or Part
Number
Power meter
E4418B/E4419B
E4418A/E4419A
Power sensor, 2.4 mm
8487A
None
Adapter, 2.4 mm (f) to 2.4 mm (f)
11900B
85056-60007
RF cable, 2.4 mm (f) to 2.4 mm (f)
85133C
85133E