24 Keysight E8363B/C and E8364B/C Installation Note
General Information
Installation Procedure for the Upgrade Kit
1-
Step 9.Reinstall the Front Panel Assembly and Front Panel Jumpers
(Option 014 Only)
Refer to
for this procedure.
1.
Tighten all 12 of the front-panel feed-through connectors using a
5/16-inch torque wrench set to 21-in lbs.
2.
Reconnect the ribbon cable (item
③
) to the A3 front panel interface board.
3.
Slide the front panel over the test port connectors being careful to align
the power switch and floppy disk drive to their corresponding front panel
cutouts. Ensure that the ribbon cable (item
③
) is located below the fan to
prevent it from being damaged by the fan blades.
4.
With a T-10 TORX driver, install the eight screws (item
✍
) in the sides of
the frame.
5.
Install the six semirigid jumpers (item
①
) on the front panel and tighten to
10-in lbs.
Before removing the front panel from the analyzer, lift and support the
front of the analyzer chassis.