Keysight E8363B/C and E8364B/C Installation Note 19
General Information
Installation Procedure for the Upgrade Kit
—
W56E8364-20168A39 bias tee to A26 test port 2 coupler
—
W55E8364-20167A38 bias tee to A25 test port 1 coupler
—
W82E8364-20054A37 step attenuator to PORT 2 SOURCE OUT
—
W84E8364-20040PORT 2 CPLR THRU to A39 bias tee
—
W81E8364-20053A36 step attenuator to PORT 1 SOURCE OUT
—
W83E8364-20039PORT 1 CPLR THRU to A38 bias tee
2.
Route the bias tee control cables through the cable clamp, (item
③
), to
the rear of the analyzer for connection to the A16 motherboard later.
3.
Reinstall the semirigid cables, (item
④
), to the detectors.
Figure 11
Cable Installation, Analyzers with Option 014 but without Option 081