114
5. Commissioning
Instruction / hand-over
The chapter "Safety instructions" must be heeded! (p. 2)
Commissioning is carried out by a specialised firm or by an
authorised KESSEL agent (at an additional charge).
The following persons should be present for the hand-over:
- Person authorised to perform the acceptance on behalf of
the building owner
- Specialised firm
In addition, we recommend the participation of operating per-
sonnel/operator, waste disposal contractor
Overview instruction:
5. 1. Making the plant ready for operation
5. 2. Checking the plant
5. 3. Instruction based on the installation and operating in-
structions
5. 4. Drawing up the handover certificate. (see chapter 13)
Once the instruction is completed, the plant must be made
ready for operation.
5.1 Making the plant ready for operation
Prior to commissioning, the plant must be completely cleaned
(including inlets and drains); solids and coarse particles must
be removed.
Both chambers of the plant must be filled UP with clear water
(see page 110).
Display/indicator panel
Movement keys/direction keys for guidance
through the program menu
Enter key/OK key
Back key/ESC key
Pilot lamp indicating readiness for operation
Pilot lamp for malfunction message
Power supply cable for control unit
Mains connection compressor
Connection compressed air sensor (optiional
accessoires)
Connection options for external signal
generator
Connection for valve block
Connecting socket for floating contact
0. 2
Dat um/ Uhr z ei t
Dat um
01. 01. 2009
Uhr z ei t
12: 00
0. 4
Nenngr ößen
EW4
EW6
EW8
EW10
…
EW24
0. 3
Kl assen
C
D
0. 1
Spr ache
deut s c h
f r anz ös i s ch
engl i s c h
0.
Syst emst ar t
Sy s t emdi agnos e
1. 5
Syst emi nf o
Uhr z ei t :
20: 45
Sc hwi mmer : S1
S2
Er e i gni s s e : Ne t z a us f a l l
Nor mal phase
System start
System diagnostic
Language
German
French
English
Date/Time
Date
01.01.02009 Time
12:00
Classes
Nominal Size
System information
Time: 20:45
Floater: S1
Events
Main power failure
Normal phase
Содержание InnoClean PLUS EW 10
Страница 2: ...2 ...
Страница 40: ...12 CE Konformitätserklärung Leistungserklärung 40 ...
Страница 85: ...85 12 Certificat de conformité declaration de performance ...
Страница 130: ...12 Declaration of performance conformity 130 ...
Страница 175: ...175 12 Deklaracja zgodności ...
Страница 176: ...176 12 Deklaracja zgodności ...
Страница 220: ...220 12 Dichiarazione di conformità CE ...
Страница 221: ...221 12 Dichiarazione di conformità CE ...
Страница 265: ...265 12 Verklaring van conformiteit ...
Страница 266: ...266 12 Verklaring van conformiteit ...
Страница 273: ...273 Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen ...
Страница 274: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen 274 France ...
Страница 275: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen France Retour de boues ...