4.8 Laying the connecting lines to the control unit
(ventilation hose and control line)
The control line and the ventilation hose must be laid in the
cable conduit between valve block and control unit (seePro-
cedure)
Procedure:
- Open the locking bracket on the valve block inside the tank
- Remove the valve block from the adapter plate
- Pull the grey ventilation hose and control line through the
cable conduit
- Connect the ventilation hose on the valve block using a
quick-action coupling (see 4.11 Point 5)
- Insert valve block on adapter plate
-
Caution:
The control line must be placed in the recess
(see figure) in order to ensure a correct latch with the ad-
apter plate.
- Check valve block for correct seat and close the locking
lever
109
15°
Min. 100 mm
15°
Air hose to the compressor
Quick-action coupling
Valve block
Locking bracket
Adapter plate
Recess for
attaching the
control line
Control line
Air hoses to the compressed air syphons
First, place the gasket (see drawing 4.9) provided into the
opening in the dome.
Grease the bottom part of the telescopic KESSEL attach-
ment piece with lubricant and place into the tank opening,
bring into the desired position and fasten by means of a
clamping ring (optional accessory). Alternatively, it is also
possible to apply lubricant to the sealing ring. With the aid of
the existing clamping ring it is now possible to fasten the
attachment piece in the desired position (alignment with the
top ground surface). The fine adjustment to the final height
is then effected with the adjusting screws. A ground slope
can be compensated for with the continuously height-adju-
stable and up to 5° inclinable attachment piece. The disposal
stickers included in the supply must be attached to the cle-
aned and dry surface on the attachment piece (see illustra-
tion).
Important:
The green disposal sticker must be placed on
the inlet side and the red one on the drain side!
The attachment piece must afterwards be sufficiently back-
filled and compacted.
4.9 Assembly of the attachment pieces
Air connection manifold
Air hose with compressor
Wastewater loading
system
Sludge transfer system
Clear water removal system
Aeration tube
4. Installation and assembly
Содержание InnoClean PLUS EW 10
Страница 2: ...2 ...
Страница 40: ...12 CE Konformitätserklärung Leistungserklärung 40 ...
Страница 85: ...85 12 Certificat de conformité declaration de performance ...
Страница 130: ...12 Declaration of performance conformity 130 ...
Страница 175: ...175 12 Deklaracja zgodności ...
Страница 176: ...176 12 Deklaracja zgodności ...
Страница 220: ...220 12 Dichiarazione di conformità CE ...
Страница 221: ...221 12 Dichiarazione di conformità CE ...
Страница 265: ...265 12 Verklaring van conformiteit ...
Страница 266: ...266 12 Verklaring van conformiteit ...
Страница 273: ...273 Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen ...
Страница 274: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen 274 France ...
Страница 275: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen France Retour de boues ...