110
4. Installation and assembly
Inlet
Outlet
4.10 Concluding filling of the tank.
Before starting to backfill, check once again the inlet
and drain line as well as the ventilation line and the
cable conduit. Align the attachment piece with the top
ground surface.
Adjust fluid levels in both chambers to the specified fill
level.
Water level height (in cm) before commissioning
EW
Sludge
Aeration chamber
4
110
134
6
110
137
8
110
134
10
110
137
12
110
137
14
110
136
16
110
137
18
110
136
20
110
137
22
110
137
24
110
136
26
110
137
28
110
136
30
110
137
32
110
134
34
110
135
36
110
136
38
110
134
40
110
135
42
110
136
44
110
137
46
110
135
48
110
136
50
110
137
Содержание InnoClean PLUS EW 10
Страница 2: ...2 ...
Страница 40: ...12 CE Konformitätserklärung Leistungserklärung 40 ...
Страница 85: ...85 12 Certificat de conformité declaration de performance ...
Страница 130: ...12 Declaration of performance conformity 130 ...
Страница 175: ...175 12 Deklaracja zgodności ...
Страница 176: ...176 12 Deklaracja zgodności ...
Страница 220: ...220 12 Dichiarazione di conformità CE ...
Страница 221: ...221 12 Dichiarazione di conformità CE ...
Страница 265: ...265 12 Verklaring van conformiteit ...
Страница 266: ...266 12 Verklaring van conformiteit ...
Страница 273: ...273 Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen ...
Страница 274: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen 274 France ...
Страница 275: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen France Retour de boues ...