132
14. Maintenance Checklist
gem. DIN 4261 -100
Name of operator:
Location:
Typ der Anlage:
Serial number:
Treatment class:
Water tightness test performed on:
Number of home occupants:
Date commissioned:
yes
no
yes
no
Pressure hose /cable installation (no kinks)
Check entries in control unit Log Book
No ground / surface water entering system
KESSEL InnoClean PLUS Maintenance Log Book
Compressor installation
Warning lamp off
Filter clean and free of blockages
Membrane replacement required
Float switch has full range of movement
Is floating sludge present?
Clean and rinse sampling chamber
Sampling chamber
Sludge transfer to tank 1 - on
Air hose connection / lifter functioning
Compressor temperature warm to the touch
Control unit
Check warnings which have been displayed
oblem / defe
Aeration hose operational
Chamber installation / situation
Compressor installation
Ventilation hose
Checked
Test solenoid valve
General visual inspection
Float switch functions at min height
Has the system overflowed?
Treatment tank (tank 2)
Inlet pipe free of blockages
System components / function
Comments
Sedimentation tank (tank 1)
Air / oxygen supply to aerator hose functioning
Float switch functions at max height.
Is floating sludge present?
Download in A4
www.inno-clean.de
changed to
no
yes, up t
Fluid level activated chamber (tank 2)
Sludge transfer (to tank 1)
Last sludge transfer on:
Activate manual sludge transfer:
Primary sludge depth
Color
Wastewater temperature tank 2 (°C)
Activated sludge volume
COD (mg/l)
NO
3
-N Nitrate (mg/l)
Wastewater analysis (Parameter soweit messbar)
NH
4
-N Ammonia (mg/l)
NO
2
-N Nitrite (mg/l)
N
ges.,anorg
total nitrogen (mg/l)
O
2
Oxygen (mg/l)
PO
4
-P
Phosphate (mg/l)
Air temperature (°C)
Compressor operation for aeration
Total time of InnoClean operation
Sludge depth
Odor
BOD
5
(mg/l)
Levels
Hours of operation
Time (hours)
Evaluation / effect
Compressor operation for transfering wastewater f
Compressor operation for pumping treated water o
Settleable solids
pH-value
Electrical conductivity (
μ
S)
Furthermore, the filter and the membrane must be replaced once every 12 months by trained service personnel.
In addition, the valve blocks must also be checked for soiling and replaced if necessary.
Содержание InnoClean PLUS EW 10
Страница 2: ...2 ...
Страница 40: ...12 CE Konformitätserklärung Leistungserklärung 40 ...
Страница 85: ...85 12 Certificat de conformité declaration de performance ...
Страница 130: ...12 Declaration of performance conformity 130 ...
Страница 175: ...175 12 Deklaracja zgodności ...
Страница 176: ...176 12 Deklaracja zgodności ...
Страница 220: ...220 12 Dichiarazione di conformità CE ...
Страница 221: ...221 12 Dichiarazione di conformità CE ...
Страница 265: ...265 12 Verklaring van conformiteit ...
Страница 266: ...266 12 Verklaring van conformiteit ...
Страница 273: ...273 Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen ...
Страница 274: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen 274 France ...
Страница 275: ...Verrohrung Tuyauteries Pipework Rury Tubazioni Leidingen France Retour de boues ...