EN
5
Commissioning
5.1
System commissioning
Check whether the steps explained in the chapter on assembly have been carried out correctly.
Clear any building waste from the tank if necessary.
Connect the system to the power supply. If applicable, lift the float switch to check whether the submersible pump starts
up automatically.
With the connection of the connection cable(s) to the power supply, the system is ready for operation.
If installed, initialisation of the control unit starts automatically (separate instructions).
6
Maintenance
Observe EN 12056-4 for maintenance.
6.1
Maintenance interval
According to standard specifications, maintenance must be carried out at the following intervals:
Quarterly for systems in commercial operations
Every six months for systems in apartment buildings
Annually for systems in single-family homes
6.2
Maintenance work
Preparatory measures
Unlock the Lock & Lift system by turning the key counter-
clockwise.
Cover plate is lifted by turning.
Lift out the cover plate.
Open the quick-release closure on the backflow preven-
ter.
Lift the pump out.
30 / 100
Lifting station/Installation and operating instructions
016-059
Содержание Aqualift S Compact
Страница 6: ...DE 2 5 Funktionsprinzip 6 100 016 059_02 ...
Страница 22: ...EN 2 5 How it works 22 100 Lifting station Installation and operating instructions 016 059 ...
Страница 38: ...FR 2 5 Principe de fonctionnement 38 100 Poste de relevage Instructions de pose et d utilisation 016 059 ...
Страница 70: ...NL 2 5 Werkingsprincipe 70 100 Opvoerinstallatie Inbouw en bedieningshandleiding 016 059 ...
Страница 86: ...PL 2 5 Zasada działania 86 100 Przepompownia Instrukcja zabudowy i obsługi 016 059 ...
Страница 98: ......
Страница 99: ...016 059_02 99 100 ...