8. Commissioning Protocol for installation company
Handover certificate
(copy for the company carrying out the installation)
❏
The initial operation and instruction was carried out in the presence of the person authorised to perform the accep-
tance and the system operator.
❏
The system operator/person authorised to perform the acceptance was informed about the obligation to service the
product according to the enclosed operating instructions.
❏
Initial operation and instruction were not carried out.
The client/ person responsible for initial operation was handed the following components and/or product components
Initial operation and instruction is being carried out by (company, address, contact, phone)
The exact coordination of the dates for initial operation/instruction is being carried out by the system operator and person re-
sponsible for initial operation.
Place, date
Signature of person
Signature of system operator
Signature of the company
authorised to perform acceptance
carrying out the installation work
Содержание 83100.10 S/X
Страница 12: ...12 Notizen...
Страница 14: ...Notizen 14...
Страница 15: ...15...
Страница 28: ...28 Notizen...
Страница 30: ...Notice 30...
Страница 31: ...31...
Страница 44: ...44 Note...
Страница 46: ...Note 46...
Страница 47: ...47...