TK-5210
(
G
)
11
INSTALLATION
Voice Guide & Storage Unit (VGS-1: Option)
■
Installing the VGS-1 unit in the transceiver
1. Remove the 4 screws from the cover.
2. Remove the cover by inserting the tip of a pair of twee-
zers into the screw hole of the cover and prying it open.
Fig. 1
3. Remove the OPTION PCB from the connector (CN501)
of the TX-RX PCB.
CN501
OPTION PCB
Fig. 2
4. Attach two cushions to the VGS-1 as shown in the fi gure
3.
Note:
Be sure not to cover the VGS-1 connector (CN1) with the
cushion.
5. Insert the VGS-1 connector (CN1) into the connector
(CN501) of the TX-RX PCB.
Cushion
(G13-1995-04)
20X30X1.0mm
Cushion
(G13-1992-04)
21X21X2.5mm
VGS-1
CN501
VGS-1
CN1
Fig. 3
6. Reinstall the cover using the 4 screws removed in step 1.
Note:
You must setup using the KPG-95DG.