![kelda 95001000 Скачать руководство пользователя страница 17](http://html2.mh-extra.com/html/kelda/95001000/95001000_manual_3951726017.webp)
10
9
Ceiling Arm Installation
Run the Overhead Shower with power to test the air and water
supply. We recommend running this test at 38°C. Please note
the bubbles do not form as consistently below 20°C. Once you
are satisfied with the bubbles, remove the protective film from the
faceplate and enjoy your BubbleSpa® shower.
Once the power is turned on, the Button Light on the Overhead
Shower will light up. This is an indicator that power is being
supplied to the shower. If you need to disconnect the power cable,
first isolate the mains. Then pull back the outer layer of the larger
connector then remove the small connector.
11
Warning!
•
Always check for hidden pipes and
cables before drilling.
•
Run water through hot and cold
pipes to clear debris from pipework
before connecting the Kelda
BubbleSpa® Shower.
!
Switch off the water then attach the Power Cable by aligning the
2 arrows on the connectors and then pushing the connectors
together until a click is heard. Then place the cables into the clips
on the Overhead Shower. Connect the other end of the power
cable to the Transformer. Then turn on the power supply to the
Overhead Shower from the mains.
17
Содержание 95001000
Страница 1: ......
Страница 10: ...Wall Arm Installation 10...
Страница 14: ...Ceiling Arm Installation 14...
Страница 30: ...Notes 30...
Страница 31: ...Notes 31...
Страница 32: ...Cut out for installing the Wall Arm Part Number 24011 32...