![kelda 95001000 Скачать руководство пользователя страница 12](http://html2.mh-extra.com/html/kelda/95001000/95001000_manual_3951726012.webp)
Screw the BubbleSpa® Overhead Shower onto the Wall Arm
Assembly. Use a 23mm spanner on the Ball Joint and a 28mm
spanner on the Ball Joint Clamp.
5
6
Wall Arm Installation
7
8
!
Switch off the water then attach the Power Cable by aligning the
2 arrows on the connectors and then pushing the connectors
together until a click is heard. Then place the cables into the clips
on the Overhead Shower. Connect the other end of the power
cable to the Transformer. Then turn on the power supply to the
Overhead Shower from the mains.
Ensure that the Overhead Shower is horizontal. If the Wall Arm
tilts slightly, tilt the Overhead Shower from the Ball Joint to
compensate. The Ball Joint allows for a maximum tilt of 10°.
Run the Overhead Shower without power to test the water supply.
Whilst the shower is running, check the entire installation for any
leaks, especially the Ball Joint and Ball Joint Clamp (circled) of the
Overhead Shower. It is important that there is no water leaking as
this can damage the fan and PCB. Make sure to also check the
mixer operation, the temperature and the flow rate.
12
Содержание 95001000
Страница 1: ......
Страница 10: ...Wall Arm Installation 10...
Страница 14: ...Ceiling Arm Installation 14...
Страница 30: ...Notes 30...
Страница 31: ...Notes 31...
Страница 32: ...Cut out for installing the Wall Arm Part Number 24011 32...