![Keithley 2000 Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/keithley/2000/2000_calibration-manual_661840041.webp)
Programming calibration dates
Program the present calibration date and calibration due date by sending the following com-
mands:
:CAL:PROT:DATE <year>, <month>, <day>
:CAL:PROT:NDUE <year>, <month>, <day>
For example, the following commands assume calibration dates of 12/15/95 and 3/14/96 re-
spectively:
:CAL:PROT:DATE 1995, 12, 15
:CAL:PROT:NDUE 1996, 3, 14
Saving calibration constants
After completing the entire calibration procedure, send the following command to save the
new calibration constants:
:CAL:PROT:SAVE
NOTE
Calibration constants will not be saved unless the :SAVE command is sent.
Locking out calibration
After saving calibration, send the following command to lock out calibration:
:CAL:PROT:LOCK
Table 2-12
AC current calibration programming steps
Calibration step
Calibrator current,
frequency
Calibration command
100mA at 1kHz
1A at 1kHz
2A at 1kHz
100.0000mA, 1kHz
1.000000A, 1kHz
2.000000A, 1kHz
:CAL:PROT:AC:STEP11
:CAL:PROT:AC:STEP12
:CAL:PROT:AC:STEP13
Calibration
2-19
Содержание 2000
Страница 1: ...Model 2000Multimeter Calibration Manual A G R E A T E R M E A S U R E O F C O N F I D E N C E ...
Страница 10: ...1 Performance Verification ...
Страница 23: ...2 Calibration ...
Страница 45: ...3 Calibration CommandReference ...
Страница 65: ...A Specifications ...
Страница 76: ...A 12 Specifications ...
Страница 77: ...B Error Messages ...
Страница 80: ...C Calibration Program ...