
Power-up sequence
On power-up, the Model 2000 performs self-tests on its EPROM and RAM and momentarily
lights all segments and annunciators. If a failure is detected, the instrument momentarily dis-
plays an error message and the ERR annunciator turns on. (Error messages are listed in Appen-
dix B.)
NOTE
If a problem develops while the instrument is under warranty, return it to Keithley
Instruments, Inc., for repair.
If the instrument passes the self-tests, the firmware revision levels are displayed. An example
of this display is:
REV: A01 A02
where: A01 is the main board ROM revision.
A02 is the display board ROM revision.
After the power-up sequence, the instrument begins its normal display of readings.
2-10
Basic Measurements
Содержание 2000
Страница 1: ...Model 2000Multimeter User s Manual A G R E A T E R M E A S U R E O F C O N F I D E N C E...
Страница 13: ...1 General Information...
Страница 19: ...2 Basic Measurements...
Страница 54: ...2 36 Basic Measurements...
Страница 55: ...3 Measurement Options...
Страница 87: ...4 Remote Operation...
Страница 139: ...5 SCPI CommandReference...
Страница 215: ...A Specifications...
Страница 226: ...A 12 Specifications...
Страница 227: ...B Statusand ErrorMessages...
Страница 233: ...C Example Programs...
Страница 246: ...C 14 Example Programs...
Страница 247: ...D Models196 199and 8840A 8842ACommands...
Страница 255: ...E IEEE 488 BusOverview...
Страница 271: ...F IEEE 488andSCPI ConformanceInformation...