6. Engine Removal;Inspection & Installation
6-57
12.3 Deputy shaft assembly instructions
According to the list, as shown in the assembly sequence
1
countershaft
6
C form block circle
2 washer
Φ
26*
Φ
35*1
7
Sliding set of 1
3
Low block gear components
8
washer
Φ
23.5*
Φ
33*1
4 washer
Φ
26*
Φ
35*1.5 9
Into
reverse
components
5
Bridge active tooth
10 Sliding set of 2
●
"C" archives circle to assembly in position .
●
Washer assembly sequence can't be wrong, at the same time, after all gear assembly to
flexible rotation.
Z-09Assembly instructions
12.4Shift drum assembly, deputy shaft
combination and driven shafts combination
as shown in the cabinet together right.
2. Deputy shaft have oil way hole side down
6
Содержание 500ATV
Страница 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Страница 16: ...1 SERVICE INFORMATION 1 14 ...
Страница 17: ...1 SERVICE INFORMATION 1 15 1 ...
Страница 18: ...1 SERVICE INFORMATION 1 16 ...
Страница 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Страница 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Страница 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Страница 71: ......
Страница 72: ......
Страница 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Страница 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Страница 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Страница 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Страница 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...