6. Engine Removal;Inspection & Installation
6-18
2
.
Right cover remove check
According to the list of instructions on the order
1
Hexagon flange bolts M6*30
18
Change shaft cover
2
Right box
19
Shift shaft cover gasket
3
Right cover gasket
20
Dowel pin
Φ
8*10
4
locating pin
Φ
6*12
21
Shift shaft assembly
5
Hexagon flange bolts M8*20
22
Hexagon flange bolts M6*20
6
Starting joints dish
23
spring washer 6mm
7
Hex flange surface nut M16
24
Washer
Φ
6*19*1.5
8
washer
Φ
16*
Φ
32*2
25
Shift gears pulled move
9
The flywheel assembly (see Z-02 flywheel
split)
26
The pipe clip
10 flat key
27
exhalent siphon
11 Beyond the clutch assembly
28
Hexagon flange bolts M6*28
12 Hexagon flange bolts M6*25
29
water pump cover
13 cable clamp
30
Pump cover gasket
14
Coil fixed a combination
31
Flange surface nut covered
form M7
15 O-ring
Φ
2.5*15
32
copper washer
Φ
7*
Φ
12*2
16 Hexagon flange bolts M6*28
33
Pump impeller components
17 Hexagon flange bolts M6*139
Содержание 500ATV
Страница 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Страница 16: ...1 SERVICE INFORMATION 1 14 ...
Страница 17: ...1 SERVICE INFORMATION 1 15 1 ...
Страница 18: ...1 SERVICE INFORMATION 1 16 ...
Страница 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Страница 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Страница 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Страница 71: ......
Страница 72: ......
Страница 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Страница 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Страница 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Страница 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Страница 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...