6. Engine Removal;Inspection & Installation
6-8
Parts clean
z
All need to use again parts should
seriously with
proper thoroughly
clean way.
warning
Use of compressed air may lead to dust and
other particles will spatter damage to the
eyes. Use of compressed air should wear
protective gear eyes
.
Reerection
z
All components to assembly must be
strictly comply with such as torque
and the whole value standard data.
z
The following parts disassembly the
application of new thing after
replace:
—
oil seal
—
washer
—
Type O sealing ring
—
lock washer
—
cotter
—
Nylon Nut
z
According to the different
position:
—
Should be in some specific part
application or/and mat of sealants.
If daub the sealants, so should be
in the installation parts before
hard sealants, so as to avoid
leakage.
—
Should be in the parts of the sports components daub on oil.
—
When reassembling before, should be in the provision of parts (such as:
oil seal) daub designated lubricating oil or grease.
Содержание 500ATV
Страница 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Страница 16: ...1 SERVICE INFORMATION 1 14 ...
Страница 17: ...1 SERVICE INFORMATION 1 15 1 ...
Страница 18: ...1 SERVICE INFORMATION 1 16 ...
Страница 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Страница 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Страница 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Страница 71: ......
Страница 72: ......
Страница 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Страница 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Страница 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Страница 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Страница 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...